---
title: Contact us - Belmont WWTW
description: Proven municipal case study showing how Hubgrade has enhanced the performance and reduced energy in the Belmont Wastewater Treatment Works
---

![Veolia logo](https://info.anz.veoliawatertechnologies.com/hubfs/vwt-global/images/header-logo-capsule.png "Veolia logo")

Based on 2023 - 2025 performance data

# Case Study: Belmont Wastewater Treatment Works

At Belmont Wastewater Treatment Works in NSW, Australia, Hunter Water faced a critical challenge: high rainfall events were stressing clarifier capacity and risking compliance breaches. Instead of building new infrastructure, they chose a smarter solution.

The results speak for themselves, including:  
**• 65% reduction in energy consumption during stormwater events**  
**• 15% overall site energy savings**  
**• Approximately AU$8.9M (5M EURO) in CAPEX savings**

The **Hubgrade Wastewater Plant (HWP) - Performance** implementation demonstrates how digital optimisation can transform wastewater operations while supporting sustainability goals.

Want to learn how they achieved these remarkable results? Download the full case study to discover:

**•** The specific challenges Hunter Water faced  
**•** The innovative solution implemented  
**•** Detailed performance data and operational benefits  
**•** Technical insights from the project team

**\[FILL FORM TO DOWNLOAD CASE STUDY\]**

[Legal Notice](https://www.anz.veoliawatertechnologies.com/legal-notice)

[Privacy policy](https://www.veoliawatertechnologies.com/en/privacy-policy-veolia-water-technologies)

[Privacy Notice](https://www.veoliawatertechnologies.com/en/privacy-notice)